Home |  Services  |  Projects  |  Products  |  Resources  |  Links  |  About  |  Contact  
 
timber design
Project
line
Details


Winner of the 2008 Timber in Construction Award for 'Best in British Timber'.



line

Description :

The Northmoor Trust required a sustainable and cost effective office building to accommodate their day to day activities. The timber framed solution was constructed on site in 2005. The locally sourced Douglas Fir timber frame was cut on site by an international team of about 70 carpenters in an intensive two week period. The timber frame event was a joint project between The Carpenters Fellowship and The Timber Framers Guild.

line

Involvement :

Concept design, 3D modeling, planning proposal, timber frame design & workshop drawings, detail design and on site participation.

line

Building control:

Darren Aspinal & Simon Jewell
Jewell & Co.

line

Structural engineer:

Stuart Coltman
Tricorn

line

Project manager:

Norman Guiver

line

Site manager:

Pat Corish

line

Interior:

Crown Construction

line

Location :

Oxfordshire

line

Photo credits :

Cameron Scott

line

The Northmoor Trust
line







This content requires Adobe Flash Player





line

timber design

line






This content requires Adobe Flash Player





line

timber design
Click the frame image to see the raising sequence.

line

timber design Back

line

 
www.timberdesign.com produced by timber design  ©